New hybrid vehicles getting kitted out for work this week!
Bryan picking up the new Mitsubishi Hybrid editions to our fleet in sunny Aberdeen.
Whats New
An up to date report on Window Two of the Accelerated Loss of Mains Change
We are now well through the process of implementation for Window 1 in the DC0079
Latest Documents
This attached PDF contains the recent modifications made to the Distribution Code, and Engineering
Media Coverage
http://www.scotsman.com/news/environment/orkney-wind-turbine-spins-into-record-books-1-3745400
Follow the link to this morings (15/4/15) Radio Orkney featuring our very own Director, Bryan
Archive
We have been appointed by Enercon for the High Voltage O&M for Ben Aketil Wind
We are providing more and more HV services to wind farms across Scotland, most recently